Early 2019 Update – 03/03/19

Since the last update a lot of progression has been made on ‘Vera‘.

After the 40’s Weekend in October, work and attention returned to ‘The Dame‘. The smoke box was removed followed by the front tube plate and the scale on the inside of the boiler barrel was removed. The boiler is now in a position to be inspected for potential work required. The inspectors we hope will be with us some time around April/May.

We can’t thank you all enough for your support in 2018. Please do keep supporting us as it all makes the return to traffic sooner.